Norgas has developed a concept for distribution of LNG on 40ft ISO containers for potential gas consumers not connected to a pipeline today. Applicable for smaller LNG volumes (0-100MW equivalent power plants, but can also be economically developed for up to 300MW depending on LNG sourcing point) and customers requiring quick startup.

 

 LNG ISO Container Solutions – Intermodal LNG Transportation

  •  developed a concept for distribution of LNG on 40ft ISO containers for potential gas ­consumers not connected to a pipeline today providing prospective clients with the following benefits:
    • Reduced lead time compared to conventional Small Scale LNG solutions – 6 months vs 24-36 months.
    • The use of standard ISO LNG containers with IMDG certification does not require extensive approval procedures before application. Can be used at the existing port and road infrastructure.
    • Lower CAPEX as intermodular infrastructure can be rented on a shorter-term basis.
    • The LNG ISO container solution can be applied anywhere in the world with a container port and suitable roads to move containers on land.